Epoxy Floor Coating
Deliver performance, protection, and visual excellence with epoxy floor coatings tailored to every space from factories to lobbies and institutions.

Epoxy Floor Coatings Application Process
01
Surface Preparation
-
Inspection: Check for oil, grease, laitance, cracks, old coatings, and moisture.
-
Surface profiling: Use mechanical grinding, shot blasting, or acid etching to open concrete pores and ensure adhesion.
-
Patching: Repair cracks and voids with suitable epoxy filler.
-
Dry condition: Ensure the substrate is completely dry before coating.
02
Primer Application
-
Product: (e.g., Luxafloor® Primer)
-
Purpose: Enhances adhesion to concrete, seals porosity, and prevents pinholes.
-
Application: Apply evenly using a roller or brush.
-
Dry Time: 4–6 hours before applying base coat.
03
Base Coat – Tailored by Area
-
Industrial Area (Left Image)
-
Product: (e.g., Luxafloor® LGE)
-
Features: High solids, durable, chemical and abrasion resistant, optional anti-slip finish.
-
Lobby or Hotel Area (Center Image)
-
Product: (e.g., Luxafloor® FCF Clear, Luxafloor® PTX Gloss)
-
Features: Sleek finish, easy maintenance, excellent wear resistance.
-
Public/Educational Area (Right Image)
-
Product: (e.g., Luxafloor® ECO2)
-
Features: Low-VOC, water-based, suitable for high-traffic spaces.
-
Application: Apply 1–2 coats by roller or notched trowel.
-
Dry Time: Minimum 4–6 hours between coats.
04
Topcoat / Optional Finish
-
Product: (e.g., Luxafloor® PTX)
-
Purpose: Adds UV resistance, color retention, and long-term durability.
-
Finish Options: Gloss, satin, or matte; optional anti-slip aggregate (e.g., Luxafloor® Aggregates).
-
Application: Roller or spray for even coverage.
-
Curing: Light foot traffic in 24 hours; full cure in 5–7 days.
05
Pro Tips
-
Always moisture test the substrate (max 5%).
-
Choose light or dark colors to define function zones.
-
Use masking tape to protect walls, skirtings, and expansion joints.
-
Avoid high humidity conditions without proper airflow.
